Crystal Peak Park Verdi Mill Pond Liner Project

F and P Construction is the contractor for the Crystal Peak Park Verdi Mill Pond Liner Project. We will be removing one foot of existing material and placing a new “fish grade” eco-friendly liner and backfilling the material back over the top. The Pond Liner will allow the county to finally fill the pond we constructed in 2007. The original pond lost too much water through an aquifer and could not hold maintain its elevation. The pond when completed will be stocked with native cut-throat trout and provide ADA accessible fishing for everyone.

Sorry, comments are closed for this post.

Crystal Peak Park Verdi Mill Pond Liner Project

F and P Construction is the contractor for the Crystal Peak Park Verdi Mill Pond Liner Project. We will be removing one foot of existing material and placing a new “fish grade” eco-friendly liner and backfilling the material back over the top. The Pond Liner will allow the county to finally fill the pond we constructed in 2007. The original pond lost too much water through an aquifer and could not hold maintain its elevation. The pond when completed will be stocked with native cut-throat trout and provide ADA accessible fishing for everyone.

Sorry, comments are closed for this post.